In 2007 the plant processed approximately 300 tons per day, generating up to 7.9 megawatt-hours (MWh) of electricity, selling about 4.3 MWh back to the power grid. Although successful, the plant is said to have been closed by 2013, not because of any technical issues, but because increasing recycling of MSW in Japan eliminated sufficient